NEO-00670-12

title - Extra Long Fluorescent Neon Yellow Dog Lead Slip

£10.00

Customer ratings and reviews

Nobody has posted a review yet
in this language

Keep Your Dog Away - Fluorescent Neon Yellow Dog Lead Slip

Our NeonDog lead slip is a fast and convenient method to broadcast a message without having to explain each time why your dog needs keeping away from other dogs etc. It simply slides over your existing dogs lead and fastens through the handle to keep it high and readable for others to see.

  • Our leads slips are professionally printed on both sides for maximum visibility, the print has a no feel finish, this means it feels part of the fabric and will last.
  • Our neon yellow lead slip colour will make the lead slip stand out from a long distance and make it more visible in low light conditions.
  • Fully machine washable, for best results use mild detergent and avoid the use of fabric softener and hang dry only (DO NOT TUMBLE DRY).
  • Available in 1 Sizes for all leads and can be attached through the handle or through the trigger hook close to the dog, ideal if you need to wrap the lead around your hand for close control.
  • All our lead slips feature a popper fastener for quick fitting and/or removal.

Watch our lead slip product video below:

Reviews

Related products

20 andra produkter i samma kategori: