NEO-00629-12

NE PAS S’APPROCHER- Extra Long Fluorescent Neon Yellow Dog Lead Slip

£10.00

Customer ratings and reviews

Nobody has posted a review yet
in this language

NE PAS S’APPROCHER - Extra Long Fluorescent Neon Yellow Dog Lead Slip

Our Extra Long NeonDog lead slips are bright and highly visible to make a fast and convenient method to broadcast your dog needs space. They simply slide over your existing dogs lead and fastens through the swivel hook on the dogs lead so the message is close to your dog or they can be put through the handle to keep it high and readable for others to see. Having the message on your lead will save you having to explain each time why your dog needs space or is acting the way they are. Simply slide over your existing dogs lead and fasten through the swivel hook or via the handle to keep it high and readable for others to see.

  • Our leads slips are professionally printed with same message on both sides for maximum visibility and durability and will make the lead slip stand out from a long distance.
  • The fluorescent yellow makes it very visible, even in low light conditions.
  • Fully machine washable, for best results use mild detergent and avoid the use of fabric softener and hang dry only (DO NOT TUMBLE DRY).
  • Size 600 mm x 50 mm (60 cm x 5 cm)
  • Popper fastener to fasten through the trigger hook (recommended) or to secure through the handle of the dog’s lead, to avoid slippage down the lead.
  • All our lead slips feature a popper fastener for quick fitting and/or removal.
  • Designed to fit any lead that you already own.

Reviews

Related products

20 other products in the same category: